PROJECT OVERVIEW:
 

The contract required the upgrade of an obsolete Reyrolle manufactured ‘TJV’ IDMTL electromechanical over current relay with a modern, digital, protection relay incorporating a ‘high-set instantaneous trip’ function on seventeen 11/3.3 kV circuits at Drax Power Station.  TP Power Services elected Siemens Reyrolle Argus-C 7SR11 relays as the digital equivalent to be combined with RMLG test blocks for more efficient testing and commissioning so that each circuit could be isolated, upgraded and commissioned within one day in order to support the stations outage programme. Direct interchangeability was obtained through detailed design studies of the existing wiring schematics and settings with considerations to be made for future upgrades.

 
SCOPE OF WORKS:

Reyrolle Argus C Relay
 
 Review of existing relay and protection settings and wiring schedules

 Design and fabrication of ‘carrier plates’ to mount new digital relays into the existing ‘cut-out’

 Pre-assembly and wiring of modern relays and test blocks into ‘carrier plates’ at TPPS factory

 Preliminary programming, secondary injection testing and trip-function testing at TPPS factory

 Removal of obsolete overcurrent relays and redundant wiring

 Installation of pre-assembled digital relay sets, wiring and input of final alarm and trip settings

 Final commissioning, function and witness testing to local circuit breaker and control room

 Updating of ‘as-installed’ wiring schematics and handover to client in AutoCAD format

 Completion of process QA documents, auditing and final handover for client records

 
PERFORMANCE REVIEW:

 
Current feedback has highlighted the technical competency, efficiency and flexibility shown by TP Power Services  to support the station’s outage schedule and ensuring the integrity of the relays replaced to date.
 
FURTHER ACTION:

 
TP Power Services site  engineers have completed the installation of the 17 circuits in conjunction with Drax's outage schedule.
 

Posted by B.A on 27 May 2011

 

Read more latest news stories...

 

About Us:

Established in 2000 by a group of electrical engineers specialising in transformers and switchgear; we have grown to offer fully integrated substation services.....

Read More...

Clients:

TPPS have built relationships with our key clients and developed our systems to ensure that we continue to meet their performance expectations.....

Read More...

Corporate Responsibility:

The company operates under an IMS based on the International Standards of Quality (ISO9001), Environmental (ISO14001) and Health & Safety (OHSAS18001).....

Read More...

TP Power Services Ltd, Head Office, Rempstone Road, Wymeswold, Loughborough, Leics, LE12 6UE, England

Telephone:
Fax:
Web Site:
Email:
Site Design: